Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Projects Corporation Limited
Tender ID3993927
Organisation NameUttar Pradesh Projects Corporation Limited
Tender BriefConstruction Of C.m. Modal Composite Vidyalaya (pri-primary To Class-12 ) (second Tehsil) At Block - Hilauli Gram- Maurawan, Mela Ramlila Trust, Maurawan District- Unnao (u.p.)
Last Date For Submission20th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost17700.00
EMD3595000.00
Estimated Cost179738000.00
Location
CityLucknow
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Construction of C.M. Modal Composite Vidyalaya (Pri-Primary to Class-12 ) (Second Tehsil) at Block Hilauli Gram- Maurawan, Mela Ramlila Trust, Maurawan District- Unnao (U.P.)
2CIVIL WORKS (MAIN BUILDING)
3Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches.1868.62CUM
4Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.4335.19CUM
5Providing and laying in position ready mixed or site batched design mix cementconcrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/ Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cementcontent, the contractor shall have discretion to either re-design the All works upto plinth level :mix or bear the cost of extra cement. Concrete of M10 grade with minimum cement content of 220 kg /cum373.08CUM
20th Apr, 2026

6 Days Left

WhatsApp