Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4829301 |
|---|---|
| Organisation Name | Uttar Pradesh Projects Corporation Limited |
| Tender Brief | Construction Of Type-iii Residence (s Plus 3) Block-a (12 Nos.) At Government I.t.i. Campus, District- Banda (u.p.) |
| Last Date For Submission | 8th Jul, 2026 |
| Opening Date | 08 Jul, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 825000.00 |
| Estimated Cost | 41268000.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of Type-III Residence (S+3) Block-A (12 Nos.) at Government I.T.I. Campus, District- Banda (U.P.) | ||
| 2 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | 182.53 | CUM |
| 3 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles. | 1144.00 | R.M |
| 4 | Vertical load testing of piles in accordance with IS 2911 (Part IV) includinginstallation of loading platform by Kentledge method and preparation of pilehead or construction of test cap and dismantling of test cap after test etc.complete as per specification & the direction of Engineer in-charge.Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing.Single pile upto 50 tonne Safe capacity Initial test (Test Load 2.5 times the Safe capacity) | 1.00 | Each |
| 5 | Routine test (Test Load 1.5 times the Safe capacity) | 3.00 | Each |
4 Days Left