Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4149805 |
|---|---|
| Organisation Name | Indian Institute Of Management |
| Tender Brief | Corrigendum : Providing Kitchen Ventilation Arrangement At Iim Lucknow, Noida Campus. |
| Last Date For Submission | 13th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 55428.00 |
| Estimated Cost | 2771371.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cat (A) -Items to be supply and installation | ||
| 2 | Air Washer Unit with Cooling Coil Supply, Installation, Testing and Commissioning of factory build floor mounted Horizontal draw, Double Skin sheet metal sectionalised construction Air Washer units with injected PUF in between. Complete with pre-filter section, fan section complete with floor standing forward curved DIDW centrifugal fan, belt drive package, base frame, squirrel cage TEFC induction motor & vibration isolation pads, wet section with S.S tank, cellulose pads, water circulation pump, and circulation arrangement, quick fill, float valve and drain assembly, eliminator section with eliminator all complete as per specifications. AWU shall be designed as per specifications and basis of design to give 90% adiabatic saturation efficiency. Including flexible canvas connections made of fire resistance flexible double canvas sleeve for duct connection. Air washers shall be selected for a maximum face velocity of 500 FPM at filter section and 500 FPM at cooling media. Anti vibration mount to avoid transmission of vibration on casing. as required and directed by Engineer-in-charge. Air Washer Unit Outer skin = 0.6 mm pre-coated GSS Inner skin (Wet) = 0.6 mm plain SS 304 Panel = 46 2 mm thick PU Foam density 40 kg/m3 Frame Work = Extruded Aluminium Tank = 18G SS-304 Hinges and Locks = Aluminium Die cast Cellulose Pad Section = SS 304 casing, 200 mm thick pad Cooling Coil Section = 4 Row Deep Coil Fan Section Outer skin = 0.6 mm pre-coated GSS Inner skin = 0.6 mm plain GSS Panel = 25 mm thick PU Foam density 40 kg/m3 Frame Work = Extruded Aluminium Fan & Motor detail Fan Size = 710 Dia(Forward Curved) Motor = 5.5 KW Pump = 1.0 HP - 02 Nos (1W+1 S) Air washer 15,500 CFM @50 mmwg static pressure | 1.00 | Each |
| 3 | Air Scrubber Unit Supply, Installation, Testing and Commissioning of factory build floor mounted Horizontal draw, Double Skin sheet metal sectionalised construction Air Scrubber units with injected PUF in between. Complete with fan section complete with floor standing Backward curved DIDW centrifugal fan, belt drive package, base frame, squirrel cage TEFC induction motor & vibration isolation pads, wet section with S.S tank, water circulation pump, and circulation arrangement, quick fill, float valve and drain assembly, eliminator section with eliminator all complete as per specifications. ASU shall be designed as per specifications. Including flexible canvas connections made of fire resistance flexible double canvas sleeve for duct connection. Air Scrubber Unit shall be selected for a maximum face velocity of 500 FPM at Eliminator section. wherever required, necessary vibration isolation arrangement as per specification complete etc as required and directed by Engineer-in-charge. Air Scrubber Unit Outer skin = 0.6 mm pre-coated GSS Inner skin (Wet) = 0.6 mm plain SS 304 Panel = 23 2 mm thick PU Foam density 40 kg/m3 Frame Work = Extruded Aluminium Tank = 18G SS-304 Hinges and Locks = Aluminium Die cast Fan Section Outer skin = 0.6 mm pre-coated GSS Inner skin = 0.6 mm plain GSS Panel = 25 mm thick PU Foam density 40 kg/m3 Frame Work = Extruded Aluminium Fan & Motor detail Fan Size = 710 Dia (Forward Curved) Motor = 11.0 KW Pump = 1.5 HP - 01 Nos AIR SCRUBBER UNIT -18500 CFM @85 mmwg | 1.00 | Each |
| 4 | Supply and Installation of Dx Type ODU Unit with leakage protection coating as required and directed by Engineer-in-charge. Supply and Installation ODU unit with gas 8.5 TR | 1.00 | Nos |
| 5 | AHU kit as required and directed by Engineer-in-charge. | 4.00 | Nos |
3 Days Left