Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4370788 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair/ Maint And Replacement Of Connected Internal Electrification Wk For Md Accn In Zone C And D Area Under Ge (west) Lucknow |
| Last Date For Submission | 18th Jun, 2026 |
| Opening Date | 20 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 98000.00 |
| Estimated Cost | 4900000.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down carefully existing aluminium or copper point wiring (light, fan, socket, bell or power) including all associated fixtures and fittings such as switches, ceiling roses, regulators, sockets, lamp/angle holder etc and making good the disturbed surfaces to an even and smooth finish using cement mortar 1:3 and applying white/colour wash to match the existing surface complete all as specified and directed. | 990.00 | Point |
| 2 | M&L for point wiring with 1100 Volts grade PVC insulated FRLS multi-stranded copper conductor cable 1.5 sqmm including PVC insulated FRLS copper earth continuity conductor 1.5 sqmm, colour-coded as per IS, drawn through and including concealed rigid non-metallic PVC conduit, medium grade, ISI marked, ivory colour of size not less than 25 mm dia with all necessary conduit fittings and accessories such as bends, tees, couplers, junction boxes etc including concealed sunken modular GI metal box of minimum 1.0 mm thickness with approved colour modular mounting polycarbonate front plate and ABS under plate with CRCA metal frame and zinc-plated steel screws suitable for mounting modular switches, sockets, regulators etc complete for the following: (a) One light or one fan point controlled by one switch. | 250.00 | Point |
| 3 | All as item No 02 above but one bell/ buzzer point controlled by one bell push complete all as specified and directed | 20.00 | Point |
| 4 | All as item No 02 above but one socket outlet 6 Amp controlled by one switch on the same board with other switches complete all as specified and directed | 60.00 | Point |
| 5 | All as item No 02 above but one socket outlet 6 Amp controlled by one switch on indepdendent board complete all as specified and directed | 120.00 | Point |
6 Days Left