Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4606080 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Mangal Pandey Road From Stn Chowk To Sadar Fly Over Under Age B/r-ii Ge (west) Lucknow. |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 24 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 135900.00 |
| Estimated Cost | 0.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | M&L for scarifying or picking gravelled macadam (WBM surface) or bituminious macadam surface in area exe 400 sqm ,exc 50 mm deep and n exe 100mm deep complete as all specified and directed. | 40 | Per 10 Sqm |
| 2 | M&L for screening road metal, Chippings, etc. on the site of the work, when specially ordered, including removing screened materials clear of screen and stacking in separate heaps for measuring (Materials from both sides of screen measured) complete as all specified and directed. | 30 | Cum |
| 3 | Labour only for 150 mm thick (Compacted thickness) WBM, in two layers with Granite coarse aggregate of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20 mm size), spread rolled and consolidated to gradient and camber required complete as all specified and directed. Note:- Screened road metal brought from item No-2 above. | 20 | Per 10 Sqm |
| 4 | M & L for 150 mm thick (Compacted thickness) WBM, in two layers with Granite coarse aggregate of grading 2 (63 to 40 mm size) or of grading 3 (50 to 20 mm size), spread rolled and consolidated to gradient and camber required complete as all specified and directed. | 20 | Per 10 Sqm |
| 5 | M&L for preparing unsurfaced WBM surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with mechanical compressor to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer at 10.0 Kg per 10 Sqm using paving bitumen VG-10 applied with mechanical bouzer complete as all specified and directed. | 40 | Per 10 Sqm |
6 Days Left