Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4463631 |
|---|---|
| Organisation Name | Lucknow Development Authority |
| Tender Brief | Gomti Nagar Yojna Ke Vijyant Khand Me Makan No- 2/1 Se 2/130, 4/775 Se 4/711, 4/253 Se 4/231, 4/649 Se 4/687 Tak Sadak Ka Sudharikaran Ka Karya |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 13 Jun, 2026 |
| Document Cost | 4366.00 |
|---|---|
| EMD | 418900.00 |
| Estimated Cost | 8378583.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carrige of mixed material by tipper to site, laying in uniform layiers with paver in sub-base / base course one well prepared surface and compacting with vibratory roller to achieve the desired density. (Sanction Rate)- morth -406 (sanctioned rate) | 622.772 | cum |
| 2 | Providing and laying bituminous macadam (B.M.) with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder @3.30%, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (Sanction Rate)-1052 | 830.362 | mt |
| 3 | Providing and applying tack coat with bitumen (Vg-10) pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.Both wheeled Roller 8 - 10 tonne capecity, finished to required level and grades. (Sanction Rate)- MoRTH based analysis-Tack Coat | 7548.750 | sqm |
| 4 | 25 mm thick Semi-Dense Bituminous Concrete (S.D.B.C.) (Using Water Plastic) providing and laying Semi-Dense Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5 per cent mix to work at site as per MORTH & H specification clause No. 508 complete in all respects(Reducing Bituminous Quantity by 8% and replacing it by Plastic wastage as per IRC : SP: 98-2013) (Sanction Rate)-1054 | 520.864 | mt |
| 5 | Providing and applying primer coat with bitumen emulsion (slowe setting) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. (Sanction Rate)- MoRTH Based Analysis | 7548.750 | sqm |
10 Days Left