| Tender ID | 4037265 |
|---|---|
| Organisation Name | Lucknow Development Authority |
| Tender Brief | Hazratganj Chaurahe And Street Ka Placemaking Ka Karya |
| Last Date For Submission | 30th Apr, 2026 |
| Opening Date | 01 May, 2026 |
| Document Cost | 2129100.00 |
|---|---|
| EMD | 4366.00 |
| Estimated Cost | 106454489.00 |
| City | Lucknow |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 33.75 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 2.25 | Cum |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for :, Foundations, footings, bases for columns. | 134.40 | Sqm |
| 4 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level | 10.00 | Qtl |
| 5 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. | 12500.00 | sqm |