Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 43963 |
|---|---|
| Organisation Name | Water Resources Department |
| Tender Brief | Corrigendum : Estimate For Laying Underground Rcc Pipeline For The Water Course Of Outlet Rd 18200/l Of 5-r Distributary (labour Component) |
| Last Date For Submission | 13th Mar, 2026 |
| Opening Date | 13 Mar, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 28160.00 |
| Estimated Cost | 1408000.00 |
| City | Ludhiana |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Mild steel requirement for RCC work where not including the complete rate of RCC including bending, binding and placing in position complete in all respects. | 1.00 | qtl |
| 2 | Shuttergate arrangement 200 mm | 1.00 | Nos |
| 3 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Earth work upto 1.5 m.Depth All classes of soil except rocky | 1.00 | Cum |
| 4 | Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Exceeding 1.5 m depth but not exceeding 2.25 m depth All classes of soil except rocky | 1.00 | Cum |
| 5 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. | 1.00 | Cum |
6 Days Left