Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Water Resources Department
Tender ID43963
Organisation NameWater Resources Department
Tender BriefCorrigendum : Estimate For Laying Underground Rcc Pipeline For The Water Course Of Outlet Rd 18200/l Of 5-r Distributary (labour Component)
Last Date For Submission13th Mar, 2026
Opening Date13 Mar, 2026
Cost
Document Cost2000.00
EMD28160.00
Estimated Cost1408000.00
Location
CityLudhiana
StatePunjab

Register to see full details

BOQ Items
#ItemQtyUnits
1Mild steel requirement for RCC work where not including the complete rate of RCC including bending, binding and placing in position complete in all respects.1.00qtl
2Shuttergate arrangement 200 mm1.00Nos
3Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Earth work upto 1.5 m.Depth All classes of soil except rocky1.00Cum
4Excavation by mechanical means(JCB or Hydraulic excavator) in trenches for pipe lines with straight or open cutting in streets or open area including trimming and dressing sides levelling of beds of trenches to correct grade, cutting joint holes, refilling consolidation,watering , including the cost of dewatering of rain water, diversion for traffic, night signals. providing & fixing caution boards, crossing over trenches for access to the houses, watching, fencing, etc. and removal of surplus soil out side/inside the town involving lead upto 15 meter complete in all respect. Exceeding 1.5 m depth but not exceeding 2.25 m depth All classes of soil except rocky1.00Cum
5Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres.1.00Cum
13th Mar, 2026

6 Days Left