Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4200916 |
|---|---|
| Organisation Name | Punjab State Power Corporation Limited |
| Tender Brief | Corrigendum : For Executing Work Of 66 Kv Line T Off From 66kv Ladhowal To Gt Road Line For 66kv S/s Bahadurke Planning No. 128 Cz 2025 26 Annexure E Rdss Work |
| Last Date For Submission | 23rd Jun, 2026 |
| Opening Date | 24 Jun, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 9510.00 |
| Estimated Cost | 475494.00 |
| City | Ludhiana |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Laying of foundations for erecting of tower of 66kv Line on Labour rates Lump-Sum basic as per PSPCL drawings including excavation, placement of steel reinforcement, concreting, stub setting, form work, centering shoring, shuttering back filling and other allied works required for setting stubs including the cost of sand and gravel complete in all respects as per PWD specifications crusher & sand to be arranged by the contractor. All other material i.e. Cement, Steel, Stub Setting templates etc. shall be provided by PSPCL from its stores at Bathinda,Verpal and Gobindgarh ) free of Cost. | ||
| 2 | Labour Charges involved in Stubbing of Z-Type CW/TT 2106 type double circuit towers | 1 | No. |
| 3 | Transportation and erection of towers complete with all fittings including tack welding including all T&P (Welding Rods to be supplied by the contractor) & zinc rich paint touching wherever required (zinc paint to be supplied by the contractor) Installation of danger plates, No. plates, Phase Plates, Ckt Plates, Bird guard & Anti climbing devices etc on labour rate basis (66 KV) | 6.76148 | MT |
| 4 | Transportation, Installation of Insulator Strings complete with all hardware fittings & Stringing & sagging of ACSR 0.4sq including fixing of its all Accessories for the 66KV line on 66KV/220KV towers on labour rates basis | 0.018 | SC Km |
| 5 | Transportation, installation, Stringing & Sagging of Earth wire size 7/2.24mm at the top of tower including fixing of earth wire accessories as on labour rate basis | 0.018 | Km |
14 Days Left