Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Panchayati Raj Department
Tender ID4859805
Organisation NamePanchayati Raj Department
Tender BriefTubewell Nirmaan Kary Godara Bas Rajasar Urf Karnisar
Last Date For Submission10th Jul, 2026
Opening Date10 Jul, 2026
Cost
Document Cost500.00
EMD20000.00
Estimated Cost1000000.00
Location
CityLUNKARANSAR
StateRajasthan

Register to see full details

BOQ Items
#ItemQtyUnits
1work detial
2Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.(PHED - BSR - 2023. Less-10%) Nominal bore 250 mm dia.100.00Mtr
3Add 15% extra on above item (Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and up to 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr.12.00Mtr
4Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.(PHED - BSR - 2023. Less-10%) Nominal bore 250 mm dia.42.90RM
5Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe.(PHED - BSR - 2023. Less-10%) Nominal bore 200 mm dia.42.90RM
10th Jul, 2026

3 Days Left

WhatsApp