Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4923471 |
|---|---|
| Organisation Name | Municipal Administration And Water Supply Department |
| Tender Brief | Corrigendum : New Construction Of Manhole Work At Pipe Line Arrangement Work At Christian Street In Ward No 22. |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 4074.00 |
| Estimated Cost | 407353.00 |
| City | Madurai |
|---|---|
| State | Tamil Nadu |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of manholes using sulphate resistant cement at various depths to invert including earth work excavation asperSS20B, laying cement concrete in C.M.1:3:6 using 40mm B.G. jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M.1:3, 20mm thick and exterior with C.M.1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G. jelly fixing the frame, providing C.I. steps, manhole cover and frame etc. complete for the following sizes for each manhole (As per the type design drawing for manholes).Size 900 x 1200 mm 4.00m depth 1.50m Depth | 2.00 | Nos |
| 2 | 2.00m depth | 2.00 | Nos |
| 3 | 1.00m depth | 1.00 | No |
| 4 | Dewatering using 3HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. Hire charges for Diesel Pump set for 5 HP | 32.00 | Hrs |
| 5 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10cum | 120.00 | m3 |
12 Days Left