Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3844617 |
|---|---|
| Organisation Name | Roads And Buildings Department |
| Tender Brief | Corrigendum : Fourlaning Of Mahuva-anval Road Km 0/0 To 28/960 Tal.bardoli, Dist.surat. |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 18000.00 |
|---|---|
| EMD | 10187000.00 |
| Estimated Cost | 1018678753.93 |
| City | Mahuva |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting trunk vegetation, grass bushes, shrubs, saplings and tree girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials (C) by mechanical means in area of light jungle | 34.690 | Hec. |
| 2 | Box cutting the road surface to proper slope & camber for making a base for road work including compacting at O.M.C. and removing the excavated stuff and depositing on the road side slopes as directed with all lead and lift. | 230672.000 | Cum |
| 3 | Construction of granular sub-base 200 mm thick by providing machine crushed B.T. material satisfying MORTH specification (Fifth revision) of grading V including spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density etc. complete. | 101581.000 | Cum |
| 4 | Construction of granular sub-base 200 mm thick by providing machine crushed B.T. material satisfying MORTH specification (Fifth revision) of grading III including spreading in uniform layer with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density etc. complete. | 76555.000 | Cum |
| 5 | Providing and laying wet mix macadam base course 250 mm thick in two layers as per MORTH specification using machine crushed B.T. chips as per required gradation, mixing with required optimum quantity of water, conveying the mix to site of work, spreading in to grade and camber with paver or mechanical means and consolidation each layer with vibratory roller to aschieve the desired density including cost of material labour plant and equipment etc. complete. | 97740.000 | Cum |
30 Days Left