Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4443910 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Ren Of Lakhora Aunch Road |
| Last Date For Submission | 4th Jun, 2026 |
| Opening Date | 04 Jun, 2026 |
| Document Cost | 2714.00 |
|---|---|
| EMD | 1775000.00 |
| Estimated Cost | 31500000.00 |
| City | Mainpuri |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and laying Dense graded bituminous macadam grading-II with 100-120TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.50 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. Excluding GST | 30.00 | cum |
| 2 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. Execluding GST | 91000.00 | sqm |
| 3 | Providing and laying bituminous concrete grading-II with 100-120 TPH hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Execluding GST | 2600.00 | cum |
| 4 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50 M (20") in depth & earth work in embankment to be in 20 cm layers including ramming & dressing the surface to required levels & solpes & also including 1.50 M lift & 30 M lead. The earth in from of cutting to be used as spoil banks with in 50 M destance as directed by E/I etc. | 1300.00 | cum |
4 Days Left