Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Dakshinanchal Vidyut Vitran Nigam Limited
Tender ID4461995
Organisation NameDakshinanchal Vidyut Vitran Nigam Limited
Tender BriefSpecial Civil Maintenance Of Sgr Building At 33/11 Kv S/s Kuchela Construction Of Approach Road At 33/11 Kv S/s Barnahal, District Mainpuri
Last Date For Submission17th Jun, 2026
Opening Date18 Jun, 2026
Cost
Document Cost3540.00
EMD23000.00
Estimated Cost1851607.00
Location
CityMainpuri
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: (DSR 2.1) All kinds of soil (DSR 2.1.1)500sqm
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (DSR 2.8) All kinds of soil. (DSR 2.8.1)38cum
3Excavating, supplying, stacking and filling of local earth (excluding royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. NSI Based on (DSR 2.25(a))204cum
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (DSR 4.1) 1:1 :3 (1 Cement: 1 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (DSR 4.1.2)10cum
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (DSR 4.1) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (DSR 4.1.8)12cum
17th Jun, 2026

15 Days Left

WhatsApp