Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4941244 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Corrigendum : Roofing Work For Varnakoodaram Project In Vadakkangara G M L P School 87-27-ward 8-makkaraparamba Gp |
| Last Date For Submission | 21st Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 555.00 |
|---|---|
| EMD | 2742.00 |
| Estimated Cost | 109678.00 |
| City | Malappuram |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | ROOFING WORK | ||
| 2 | 10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 342.654 | kg |
| 3 | OD91044/2026-2027:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.35 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm , in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length up to 12 meter or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete up to any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 81.300 | sqm |
| 4 | OD34230/2026-2027:Engaging coolie for removing and re fixing eave gutter including all charges etc complete | 4.000 | each |
| 5 | OD66723/2026-2027::Providing and fixing 125mmPVC eve gutter fixing in MS flat fabricated in semi cercular shape and screwed to fix including all cost conveyances and labour charges etc. | 11.000 | metre |
Closed