Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3367308 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Corrigendum : Dedicated Pipe Laying For Better Functionality And Providing Balance Fhtc For Mahil Water Supply Scheme At Gazole Block Of Malda District Under Malda Division, Phe Dte. Govt. Of West Bengal, (2nd Call) |
| Last Date For Submission | 13th May, 2026 |
| Opening Date | 15 May, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 113425.00 |
| Estimated Cost | 5671233.00 |
| City | Malda |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Part A:- Laying of Distribution System including supply of UPVC/HDPE pipe, Specials, Valves and other alied works etc .. | ||
| 2 | Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder, road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excecution , necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store. N.B: i) Any deviation from required clear cover of 1.10mtr., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on prorate basis over the rate of entire item ii) No payment will be made without hydraulic test of the pipe line either part or full iii) The pipes, specials and valves , rubber gasket will be supplied deptt. free of cost. | ||
| 3 | a) 100 mm dia D.I, | 220.00 | /Mtr. |
| 4 | Cutting DI pipe (all class & type) to required length with cutting device etc. and grinding the cutting portion with file as per direction and satisfaction of EIC. | ||
| 5 | a) 80mm.dia.to 125mm.dia pipe | 45.00 | /Mtr. |
54 Days Left