Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4453500 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Short Term Measure Through Placement Of Gabions By Mechanically Woven Double Twisted Hexagonal Wire Mesh Boxes Filled With Sand Filled Hdpe Bags And Repair Of Existing Gabions At The Downstream Bed Of Tilpara Mihirlal Barrage |
| Last Date For Submission | 2nd Jul, 2026 |
| Opening Date | 03 Jul, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 567920.00 |
| Estimated Cost | 28395993.00 |
| City | Malda |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTHClause2500, of required size, MeshType10x12(D=100mmwithtoleranceof 2%), Zinc+PVCcoated,Meshwirediameter2.7/3.7mm (ID/OD), tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabionboxes, filledwith sand filledHighDensity Polyethylene (HDPE) bagof size0.84mx0.38m conforming toBIS : 14252 : 2015, asperdrawing, includingcostof filledupHDPEbags,placinginside Gabionstructureall complete, asperdirectionsof Engineer- in-charge. Size of Gabion 1.50 m x 1.50 m x 0.50 m | 527.00 | Each |
| 2 | Supplying, fitting and fixing mesh of size 150mmx 150mm placedover topof gabionof size2.50mx 2.50m made of 5.5mm dia single strand wire knotting by 18 HWGG.Iwire includingcost of all labour, single strand steel wire and G.I wire complete in all respect to avoid dislodging of bouldersduetoheavywater thrust inwater falling zone as per direction of Engg. In Charge. | 3277.6400 | sqM |
| 3 | Repairing of existing polypropylene Gabion of mesh size 145x145 if damaged replace with new mesh of any size and fix/ tied with surrounding Gabions including cutting the wires of reforcement and damaged polypropylene mesh fill the depression with boulders and refitting the Gabion mesh with the new one and refitting the top reinforcement including cost and carriage of all materials,toolsand equipments but excluding the supply of boulder for filling as per instruction of E.I.C. | 3906.25 | SqM |
| 4 | Labour charges for collecting loose scattered laterite and stone boulders from slope ,bed or apron and stacking the same above ground level within a lead of 100metre and all lifts as per direction of the Engineer - in-charge. | 36818.46 | CuM |
| 5 | Labour charge for dumping/ laying of Laterite/ Stone Boulders /Shingles/ Brick Bats, from stack of work site with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/Sea bed to an uniform thickness as per direction of the Engineer-in-charge including cost of all accessories and other incidental charges. (a) Boulder 20 kg & above where boats are not necessary. | 36818.46 | CuM |
9 Days Left