Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4032864 |
|---|---|
| Organisation Name | Border Security Force |
| Tender Brief | Repair And Maintenance Of Type-iv Qtr No. 04 At Baishnabnagar Campus Of 119 Bn Bsf Under Shq Bsf Malda |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 3009.00 |
| Estimated Cost | 150471.00 |
| City | Malda |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws | 1.85 | sqm |
| 2 | Providing and fixing aluminium sliding door bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with nuts and screws etc. complete : | 2.00 | each |
| 3 | Providing and fixing aluminium tower bolts ISI marked anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade with necessary screws etc. complete : 250x10 mm | 2.00 | each |
| 4 | Providing and fixing aluminium handles ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade with necessary screws etc. complete :125 mm | 4.00 | each |
| 5 | Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of cross-section 90 mm x 45 mm having single rebate of 32 mm x 15 mm to receive shutter of 30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated polyester resin and chopped mat. Door frame laminate shall be 2 mm thick and shall be filled with suitable wooden block in all the three legs. The frame shall be covered with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady the frame. | 5.00 | Metre |
5 Days Left