Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4247530 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Development Of Tourism Infrastructure At Malikeswar Temple In Malkangiri District. |
| Last Date For Submission | 25th May, 2026 |
| Opening Date | 26 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 670000.00 |
| Estimated Cost | 67021463.00 |
| City | Malkangiri |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation of foundation in laterite rock or any hard rock(other than granite or disintigrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the Department. | 311.920 | cum |
| 2 | Earthwork in Excavation in hard soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre lift and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. | 1,752.420 | cum |
| 3 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (IMIDACHLOPRIED 30.5SC mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.(make-premise-BAYER,Paxton-FMC,ozie-KALYANI) | 1,429.550 | sqm |
| 4 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour, T & P completed as directed by the Engineer-in-Charge. | 7,827.500 | cum |
| 5 | Supplying & filling of foundation with course sand well watered and rammed including cost, cost of all labour, carriage, royalty complete in all respect. (As Per A/R Page No-1, Item No-2) | 704.830 | cum |
13 Days Left