Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: NHPC Limited
Tender ID4369266
Organisation NameNHPC Limited
Tender BriefCorrigendum : Carrying Out Of Diamond Core Drilling In Nx Size In Different Formations At Hurla Trench Weir Site Of Parbati-h.e. Project (stage-ii) (package No-c-871)
Last Date For Submission12th Jun, 2026
Opening Date18 Jun, 2026
Cost
Document Cost1180.00
EMD126000.00
Estimated Cost6277988.00
Location
CityMandi
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Transportation cost of Drilling equipment like Machines, Pumps and accessories by 10 T capacity motor vehicles including loading, unloading and security complete. Up to 100 Km.2.00Each trip
2Dismantling, transportation and assembling of Drilling Machines of different capacity complete by head load including cost of labour, T&P, etc as per directions of engineer-in-charge: up to 100 m lead.6.00Each Machine
3Construction of Platform with locally available material of size 6 m x 6 m x 1 m for housing the Drilling Machine complete with cost of labour, material, T&P and transport as per directions of engineer-in-charge.6.00Each
4Laying of Temporary Water Supply pipelines (25 mm diameter and above) of varying lengths from the nearest water source and construction of Temporary Water Retaining Pit of size 2 m x 1 m x 0.5 m complete with cost of all labour, material, T&P and transport as per directions of engineer-in-charge,Including the cost of GI pipes and fittings: upto 200m. 2.00Each
5Carrying out of Diamond Core Drilling in NX size in different formations and at locations other than under water not involving construction of floating platform including preservation of cores in core boxes of standard dimensions made of seasoned local wood as per BIS standards, their marking and taking colour photographs of the preserved cores etc complete with cost of all labour, T&P and POL as per directions of engineer-in-Charge: In overburden soil and sandy strata mixed with boulders up to 100 m depth.300.00Meter
12th Jun, 2026

6 Days Left

WhatsApp