Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4966807 |
|---|---|
| Organisation Name | Himachal Pradesh State Electricity Board Limited |
| Tender Brief | Corrigendum : Deposit Estimate For Shifting Of 1- Phase L.t. Line Passing Over The Land Of Sh. Abhishek And Shifting Of 3-phase L.t. Line Passing Over The Premises Of Sh. Kalu Ram In (e) Section Local And Tikken Under Esd, Hpsebl, Barot |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 1210.00 |
| Estimated Cost | 120568.00 |
| City | Mandi |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantalling of Conductor (30 mm ) for L.T.Line (1 PH LT Line):- Removel of conductor, de-stringing & removal from insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.06 | Per Kms |
| 2 | Dismantalling of Conductor (50/55 mm ) for L.T.Line (3 PH LT Line):- Removel of conductor, de-stringing & removal from insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.1 | Per Kms |
| 3 | Dismantalling of G.I.Wire (8 SWG):- Removel of GI wire, de-stringing & removal from insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.16 | Per Kms |
| 4 | Erection of Steel Tubular Pole L.T.:- Digging of Pit , Drilling of holes in Pole X-Arm , Erection of Pole , Erection of X-Arm , Shackle Insulator,Painting of Pole and Filling of Pit and Ramming Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 4 | Job |
| 5 | Erection of L.T.Stay Set.:- Digging of Pit , Fixing of Stay road ,Nozzeling & tightening Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 5 | Job |
Ending Today