Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4966806 |
|---|---|
| Organisation Name | Himachal Pradesh State Electricity Board Limited |
| Tender Brief | Corrigendum : Estimate For Providing L.t. Extension To Left Out Houses From Various Sub-stations In (e) Section Local And Harabag Under Esd No I, Hpsebl Joginder Nagar. |
| Last Date For Submission | 22nd Jul, 2026 |
| Opening Date | 22 Jul, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 2255.00 |
| Estimated Cost | 225130.00 |
| City | Mandi |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | "Erection Part LT":- Mannual Carriage of 0.310KM 1-Phase LT line material on steel tubular pole from road head to site of work considering average lead 0.4 Km. (0.310x0.4=0.12 Km ) Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.12 | Per Kms |
| 2 | Mannual Carriage of 0.545KM 1-Phase LT line material on steel tubular pole from road head to site of work considering average lead 0.2 Km. (0.545x0.2=0.11Km ) Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.11 | Per Kms |
| 3 | Erection of Steel Tubular Pole L.T.:- Digging of Pit , Drilling of holes in Pole X-Arm , Erection of Pole , Erection of X-Arm , Shackle Insulator,Painting of Pole and Filling of Pit and Ramming Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 13 | Job |
| 4 | Erection of L.T.Stay Set.:- Digging of Pit , Fixing of Stay road ,Nozzeling & tightening Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 20 | Job |
| 5 | Sagging of Conductor (50 mm ) for 1 Ph L.T.Line :- Laying of Conductor , Stringing and Sagging and Binding with Insulator Complete in all respects as directed by Engineer-In-Charge including all types of lead lift and other incidental Etc. | 0.855 | Per Kms |
Ending Today