Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Himachal Pradesh Irrigation And Public Health Department
Tender ID4835186
Organisation NameHimachal Pradesh Irrigation And Public Health Department
Tender BriefDeposit Work Sdf 2025 1293 Restoration Of Rain Damages Wss Heun Pehad Oddi In Gp Saraskan In Tehsil Dharampur Distt. Mandi Hp. Construction Of Source Intake Chamber With Filter Unit At Sundal
Last Date For Submission13th Jul, 2026
Opening Date14 Jul, 2026
Cost
Document Cost350.00
EMD3383.00
Estimated Cost169179.00
Location
CityMandi
StateHimachal Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when requaired into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth upto all lead and lifts as per direction and to the entire satisfaction of Engineer-in-Charge.6.71Cum
2Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6 graded crushed stone agg. 20mm nominal size) and curing complete excluding cost of form work in:-2.03Cum
3Providing and laying cement concrete 1 : 1 : 3 ( 1 cement : 1 : sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinfocement for reinforced concrete work in foundation and plinth.
4Foundation footings bases of columns and the like and mass concrete. as per the direction and to the entire satisfaction of Engineer-in-charge upto all lead and lift.1.28Cum
5Walls any thickness but not less than 0.1m thickness including attached pillaster buttresses, plinth and string courses from top of foundation upto two level all floor level as per direction and to the entire satisfaction of Engineer-in-Charge.3.16Cum
13th Jul, 2026

9 Days Left

WhatsApp