Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4122900 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Restoration Of Rain Damages To Wss Bhatera Kaflon In Gp Brikhmani Tehsil Balh Distt. Mandi (h.p). |
| Last Date For Submission | 6th May, 2026 |
| Opening Date | 06 May, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 4500.00 |
| Estimated Cost | 220412.00 |
| City | Mandi |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kind of soils such as pick work jumper work,saturated soil including blasting soft/hard rock, chiseling soft/hard rock where blasting is prohibited in all lifts including trimming and dressing of sides, levelling of bed, stacking the excavated soil clear from the edge of excavation and then returning the excavated soil in 15cm. layers when required into plinths,side of foundations etc including consolidating each deposited layer by ramming , watering and then disposing of all surplus excavated soil as directed in all leads & lifts and shoring strutting, timbering where ever required as per direction & best satisfaction of the Engineer-in-Charge. | 10.91 | Cum |
| 2 | Providing & laying cement concrete 1:3:6 (1 cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.75 | Cum |
| 3 | Providing and laying cement concrete 1:1.5:3 (1 cement: 1.5 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work & reinforcement for reinforced concrete work in:- | ||
| 4 | Foundation and plinth including carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 2.70 | Cum |
| 5 | Walls (any thickness but not less than 0.10m thickness) including attached butteresses, pillaster plinth and string courses etc. from top of foundation level upto floor two level i/c carriage of material with in all leads and lifts as per the direction and satisfaction of Engineer-in-Charge. | 3.98 | Cum |
7 Days Left