Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5023793 |
|---|---|
| Organisation Name | Himachal Pradesh Irrigation And Public Health Department |
| Tender Brief | Restoration Of Rain Damages To Wss Passal Sukhbag In Tehsil Joginder Nagar Distt Mandi Hp. Sh Co Intake Chamber 03 Nos , Butt Welding Of 65 Mm 100 Mm Dia And Co Anchor Block Under Pdna |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 350.00 |
|---|---|
| EMD | 3284.00 |
| Estimated Cost | 164183.00 |
| City | Mandi |
|---|---|
| State | Himachal Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation and trenches in earth work,lifts up to 1.50 meters atacking the excavated soil not more than 3 meters clear from the edge of the excavation and then returning the stacking soil in 15cm .layers, when required in to plinths sides of foundations etc, consolidating each deposted layer by ramming and watering and then deposing of all surplus excavated earth as directed with in a lead of 20 metres in all respect with in all leads and lifts as per the direction of Engineer-in-Charge. | 8.06 | Cum |
| 2 | Providing and laying cement concrete 1:3:6 (1 cement: 3 sand: 6graded stone aggregate of 40mm nominal size)and curing complete excluding cost of form work including all leads and lifts: a) Foundation and Plinth. | 0.95 | Cum |
| 3 | P/L cement conc 1: 1 :3 (1cement:1:1 sand :3 graded stone agg. 20mm nominal size) and curing complete excludidng cosot of form work and reinforcement for RCC work in foundation and plinth with in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge | ||
| 4 | Foundations, footings, basses of columns and the like and mass concrete in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge. | 0.95 | Cum |
| 5 | Walls (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and strining courses etc.from top of foundation level upto floor two level in all leads and lifts as per direction and to the entire satisfaction of the Engineer-in-charge. | 1.93 | Cum |
8 Days Left