Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4244012
Organisation NamePublic Works Department
Tender BriefLaying Pavers For Saidham Sai Baba Temple, Tolleband, Aquem, Margao In Margao Constituency.
Last Date For Submission14th May, 2026
Opening Date14 May, 2026
Cost
Document Cost5000.00
EMD43617.00
Estimated Cost2180846.00
Location
CityMargao
StateGoa

Register to see full details

BOQ Items
#ItemQtyUnits
1Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm.317.25sq.m
2Providing and laying factory made Shot blasted cement concrete interlocking paver block of minimum M35/M40 grade made by heavy duty block making machine with strong vibratory compaction and of aprpoved size and design / shape laid in 50 mm thick compacted bed of coarse sand filling the joints with coarse sand etc. all complete as per the direction of Engineer.- in I Wave Rectangular Square etc. shapes. The products should comply to IS 15658: 2006 and manfucatured by ISO9001: 2008 certified plant. The shot blasting should be done using 0.4- 0.5mm dia steel shots with a speed of 3200 rpm.;60 mm thick in all colours except grey (M35 grade)294.03sq.m
3Precast plain cement chequered tiles 22 mm thick of required shades laid in floors treads of steps and landing on 20 mm thick bed of Cement mortar 1:4 (1cement : 4 coarse sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and cleaning etc. complete.;Dark shades using ordinary cement317.25sq.m
4Earthwork in surface excavation not exceeding 30 cm depth(but exceeding 1.5 m width as well as 10 sq.m on plan) including disposal of excavated earth beyond work site for all leads lift disposed earth to be leveled and neatly dressed in:;Hard soil611.28sq.m
5Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.122.26cu.m
14th May, 2026

2 Days Left

WhatsApp