Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Housing And Development Board
Tender ID4584913
Organisation NameUttar Pradesh Housing And Development Board
Tender BriefCorrigendum : Construction Work Of Interlocking Roads, Drains And Culverts In Radhika Vihar Yojna Phase 1 And 2 In Mathura District Under Project Infrastructure.
Last Date For Submission8th Jul, 2026
Opening Date09 Jul, 2026
Cost
Document Cost7080.00
EMD714000.00
Estimated Cost35681000.00
Location
CityMathura
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavation in foundation in ordinary soil by manual mean (loam, clay or sand) lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in-charge upto a distance of 30m from the foundation trenches. (S.I. No.-251)605.03Cum
2Providing & laying cement concrete 1:4:8 (1 part cement, 4 part approved coarse sand and 8 part 40mm nominal gauge stone ballast) in foundation & upto plinth with curing complete including cost of form work and as per direction of E/I. (S.N.-2 of CH-5) (SOR-2022-23)169.66Cum
3Class-150 brick work in 1:6 cement and coarse sand mortar foundation & upto plinth including supply of all material labour T&P etc. required for proper completion of the work as per direction of E/I. (S.I.-303)341.83Cum
4Providing & laying cement concrete in 1:2:4 (1 part cement and 2 part approved coarse sand & 4 part 20mm gauge stone grit) in foundation & upto plinth with curing complete including cost of form work and as per direction of E/I (S.I.-279a)42.06Cum
512mm thick cement plaster 1:4 cement and coarse sand mortar in single coat of fair side brick wall for interior plastering upto plinth including internal rounded angles, chamfers and/or rounded angles not exceeding 80mm in girth and finished even an smooth No extra for mixing and additive including supply of all material labour T&P etc. as per direction of E/I. (S.I.-582-II)1289.76Sqm
8th Jul, 2026

4 Days Left

WhatsApp