Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID5002972
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Provn Of Interlocking Tiles Footpath Near Basantar War Memorial And Provn Other Sanctioned Works Under Age B/r - I Of Ge (west) Mathura
Last Date For Submission14th Aug, 2026
Opening Date21 Aug, 2026
Cost
Document Cost500.00
EMD53292.00
Estimated Cost2664000.00
Location
CityMathura
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Excavating in post holes (or similar holes) each not exc 0.50 cum in soft / loose soil, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers n.exc 25cm, watering, and removing surplus soil to a distance n.exc 50 m and making good surface complete all as specified and directed by Engineer-in-charge. 89.00Each
2M & L for PCC (1:3:6) type C-2 using 40mm graded stone aggregate as in foundation for post & struts & mass concrete including necessary form work and fair finishing complete all as specified and directed by Engineer-in-charge. 19.00Cum
3S&F MS screw bolt 05 to 10mm dia, length of bolt not exceeding 50mm long machine made with hexagonal or square head at one end and screwed the other or serewed both ends, each screwed end fitted with washer and one hexagonal or square nut complete all as specified and directed by Engineer-in-Charge. 8.00Kg
4Fixing only mild steel galvanized chain link fencing any mesh, size and type to any type of standards, rails, straining bolts etc. including provision of binding wire complete all as specified and directed by Engineer-in-charge. Note :- Supply only chain link fencing shall be measured and paid for separately under respective item of BOQ. 462.00Sqm
5Supply only mild steel galvanized chain link fencing of any mesh, size and type complete all as specified and directed by Engineer-in-charge. Note:- (i) Flat iron, round bars, nut bolts and washer shall be measured and paid for separately. (ii)The payment shall be made to the contractor for actual weight ascertain by the BOO as odered by GE. 1386.00Kg
14th Aug, 2026

6 Days Left

WhatsApp