Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Mathura Vrindavan Development Authority
Tender ID4864972
Organisation NameMathura Vrindavan Development Authority
Tender BriefCorrigendum : Work No. 03 Govind Vihar Awasiya Yojna Me Over Head Tank, Bhumigat Tank Evam Borvel Ka Nirman Karya
Last Date For Submission13th Aug, 2026
Opening Date14 Aug, 2026
Cost
Document Cost5900.00
EMD1056000.00
Estimated Cost52796000.00
Location
CityMathura
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.172.00Cum
2Diluting and injecting chemical emulsion for post-constructionai anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With chlorpyriphos/lindane E.c. 20% with 1% concentration143.00Sqm
3Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20%36.00Ltr
4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)13.00Cum
5Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 500mm dia Pile360.00Mtr
13th Aug, 2026

8 Days Left