Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4866377 |
|---|---|
| Organisation Name | Mathura Vrindavan Development Authority |
| Tender Brief | Corrigendum : Work No. 04 Hanumat Vihar Awasiya Yojna Me Over Head Tank Evam Bhumigat Tank Ka Nirman Karya |
| Last Date For Submission | 13th Aug, 2026 |
| Opening Date | 14 Aug, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 1056000.00 |
| Estimated Cost | 52796000.00 |
| City | Mathura |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 172.00 | Cum |
| 2 | Diluting and injecting chemical emulsion for post-constructionai anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With chlorpyriphos/lindane E.c. 20% with 1% concentration | 143.00 | Sqm |
| 3 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/ Lindane emulsifiable concentrate of 20% | 36.00 | Ltr |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 13.00 | Cum |
| 5 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 500mm dia Pile | 360.00 | Mtr |
8 Days Left