Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4864939 |
|---|---|
| Organisation Name | Mathura Vrindavan Development Authority |
| Tender Brief | Corrigendum : Work No. 16 Janpad Mathura Ke Mahavan Tahsil Ke Gram Mahavan Bangar Ke Majra Prem Nagar Me Isthit Baudh Vihar Parisar Ke Saundrikaran Ka Karya |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 226000.00 |
| Estimated Cost | 11344000.00 |
| City | Mathura |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3500.00 | Sqm |
| 2 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 420.00 | Cum |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.. All kinds of soil | 21.00 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 25.00 | Cum |
| 5 | Construction of Granular Sub Base by Providing Granular Material, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Froont & Loader at OMC and compacting with Vibratory Roller to achieve the desired density, complete as per clause 401 | 187.00 | Cum |
5 Days Left