Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4646434 |
|---|---|
| Organisation Name | Mathura Vrindavan Development Authority |
| Tender Brief | Corrigendum : Work No. 02 Kokilavan Shanidham Parikrama Marg Ke Kinare Ritaning Wall Evam M.s. Reling Ka Nirman Karya |
| Last Date For Submission | 3rd Jul, 2026 |
| Opening Date | 04 Jul, 2026 |
| Document Cost | 5900.00 |
|---|---|
| EMD | 583000.00 |
| Estimated Cost | 29167000.00 |
| City | Mathura |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-incharge. All kinds of soil | 2736.00 | Cum |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 200.00 | Cum |
| 3 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement:6coarse and:12 graded stone aggregate 20mm nominal size) upto plinth level with: cement mortar 1:6 | 2147.70 | Cum |
| 4 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 4000.00 | Cum |
| 5 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 114000.00 | Kg |
5 Days Left