Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4880481 |
|---|---|
| Organisation Name | Rural Development Department |
| Tender Brief | Corrigendum : Special Repair To R.i Office Cum Residence At Gudgudia_building |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 28 Jul, 2026 |
| Document Cost | 2000.00 |
|---|---|
| EMD | 4204.00 |
| Estimated Cost | 420376.00 |
| City | Mayurbhanj |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing and leveling the bed up to the required depth and depositing the excavated materials with all leads and lifts T&P shoring & Shuttering if required etc.complete as directed by the Engineer-in-charge | 22.05 | Cum |
| 2 | Supplying, filling in foundation and plinth with sand including watering ramming, cost, conveyance, royalties and all taxes of materials and cost of labour with T&P required for the work etc. complete as directed by the Engineer-in-charge | 4.72 | Cum |
| 3 | Cement concrete(1:3:6) in foundation and plinth below the base course of flooring using 4cm size black hard hand broken granite stone metals of approved quality from approved quarry including lowering laying concrete watering and curing etc.complete to required levels laid in layers not exceeding 6" thick including cost,conveyance,royalties and all taxes of all materials and cost of all labour with T & P required for the work complete. | 4.73 | Cum |
| 4 | Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10"x5"x3" having crushing strength not lessthan 75 Kg/Cm2 in Foundation and Plinth after immersing the bricks for six hours in water before use in all floors with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. | 4.32 | Cum |
| 5 | Brick masonary in cement mortar (1:6) using Flyash Bricks of size 10" x 5" x 3" having crushing strength not lessthan 75 Kg/Cm2 in super structure after immersing the bricks for six hours in water before use in superstructure in all florrs with all necessary projection, cutting mlulding, corbelling, champering, watering and curing including cost conveyance, royalties and taxes of all materials and labour T&P required for the work etc.complete as per the direction of Engineer in Charge. | 25.20 | Cum |
11 Days Left