Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4857098 |
|---|---|
| Organisation Name | Odisha Tourism Development Corporation Limited |
| Tender Brief | Infrastructure Development Of Pakhnapat Temple Of Jamda Block In Mayurbhanj District |
| Last Date For Submission | 20th Jul, 2026 |
| Opening Date | 21 Jul, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 1532160.00 |
| Estimated Cost | 153216615.00 |
| City | Mayurbhanj |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cleaning & grubbing road land including uprooting rank vegetation ,grass bushes ,shrubs,saplings & trees girth up to 300mm ,removal of stumps of trees cut earlier & disposal of unserviceable material & &stacking of serviceable material to be used or auctioned ,up to a lead of 1000meters including removal & disposal of top organic soil not exceeding 150mm in thickness comleted. | 30173.98 | SQM |
| 2 | Earthwork in excavation of foundation trenches in ordinary soil including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge. | 15,867.58 | CuM |
| 3 | extra for every additional lift of 1.5 m or part there of in excavation/ banking excavated or stacked materials | 223.30 | CuM |
| 4 | Supplying and filling in foundation trenches and plinth, ditches with sand well-watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per specification and direction of Engineer-in-charge. (Measurement will be taken on finished compacted section only). | 4,655.99 | CuM |
| 5 | Filling at all depth with available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 15cm in depth: consolidating each deposited layer byramming and watering complete (lead upto 100m) as directed by the Engineer-In-charge. | 3,358.84 | CuM |
13 Days Left