Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4242254 |
|---|---|
| Organisation Name | Zila Parishad |
| Tender Brief | Construction Of Panchayat Bhawan Nawgarh, Gp Nawgarh Block Tarhasi, District Palamu Under Zila Parishad, Palamu. |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 199780.00 |
| Estimated Cost | 9989000.00 |
| City | MEDININAGAR |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Eartwork in excavation in foundation trenches in hard soil (vide classification of soil item-A) and disposal of excavation earth as obtained to a distace up to 50m including all lifts levlling ramming the foundation trenches removing roots trees surbs all complete as per approved designed Building specification and direction of E/I | 311.62 | M3 |
| 2 | filling in Foundation trenches and plinth in layers not exceeding 150mm thick well watered , rammed , fully fully compacted and fine dressed with earth obtained from excavation of foiundation trenches within a lead of 50M and lifts of 1.5m all complete as per building specification and direction of E/I. | 150.05 | M3 |
| 3 | filling in Foundation trenches and plinth in layers not exceeding 150mm thick well watered , rammed , fully fully compacted and fine dressed with earth obtained from excavation of foiundation trenches within a lead of 50M and lifts of 1.5m all complete as per building specification and direction of E/I. | 136.56 | M3 |
| 4 | Proving coarse clean sand in fillig in foundation trenches or in plinth includding ramming and watering in layes not exceeding 150mm thickwith all leads and lifts including cost of all materials, labours, royalty and taxes all complete as per approved designed Building specification and direction of E/I ( mode of Measurement of compacted volume). | 71.98 | M3 |
| 5 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 381.94 | M2 |
6 Days Left