Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4823195 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Corrigendum : Construction Of A Cc Road In Ward-61, Shastri Nagar Sector-09, Extending From N.c. Azads House To House No. 149/9 And The Adjacent Lane |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 14 Jul, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 61610.00 |
| Estimated Cost | 1232195.00 |
| City | Meerut |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material within all lifts and lead upto 1km (by mechanical means).. | 608.00 | sqm |
| 2 | Supplying and stacking at site 53 mm to 22.4 mm size stone aggregate. | 14.59 | Cum |
| 3 | Laying, spreading and compacting stone aggregate of specified sizes, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate excluding of roller charges. | 14.59 | Cum |
| 4 | Providing and laying design mix cement concrete of M-30 grade, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer -in-charge Cement concrete prepared with batch mixing machine | 136.80 | Cum |
| 5 | Trimix for C.C. road etc. including hire & fuel charge of concrete floter + all completion of work. | 912.00 | Sqm |
3 Days Left