Tender BriefCorrigendum : Construction Work Of Drinking Water Facility, Toilet Block, 02 Nos. Additional Class Room And Library At Govt. High School Peeplikheda In District Meerut
Last Date For Submission14th May, 2026
Opening Date14 May, 2026
Cost
Document Cost11800.00
EMD146000.00
Estimated Cost7256000.00
Location
CityMeerut
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1DRINKING WATER POST. Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil2.440CUM
2Providing and laying in cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form- work, in foundation and floors.1.400CUM
3Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete..0.240CUM
4Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). UP TO P.L in Plinth Beam0.140CUM
5Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). (Above plinth Beam). R.C.C. work in Slab0.830CUM