Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4468802 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Periodical Services For Smart Painting In Md And Otm Bldgs Under Age B/r-i Of Ge (north) Meerut Cantt |
| Last Date For Submission | 30th Jun, 2026 |
| Opening Date | 07 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 0.00 |
| City | Meerut |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Taking down cement plaster from brick or stone walls incl racking out joints hacking for key, scrubbing down with water etc. | 1800.00 | Sqm |
| 2 | M&L for rendering 5mm thick cement plaster with cement mortar(1:4) on concrete surface as in ceiling finished even and smooth without using extra cement. | 100.00 | Sqm |
| 3 | M & L for applying 15 mm thick rendering using ready mix plaster bags in CM 1:4 on brick / concrete surfaces of external walls finished even and fair, complete all as specified and directed. | 1300.00 | Sqm |
| 4 | M & L for applying 15 mm thick rendering using CM 1:6 on brick / concrete surfaces/ walls finished even and fair, complete all as specified and directed. | 400.00 | Sqm |
| 5 | M&L for preparation of new plastered of exterior/Interior wall/Ceiling of projection/chajja and applying 1 mm thick jk wall care putty to obtain smooth finishes complete all as specified and directed. Note:- (i) The newly plastered surface must be prepared in a manner so that there should not be any impression of dent and it should be made even all as per manufacture instruction before application of emulsion paint the cost of all material. T&P and labour required for preparation of surface are deemed to be included in the rate quoted. Emulsion paint work shall to be paid under item No 15 and OBD work shall to be paid under item No 11 (ii) The cost of scaffolding wherever required are deemed to be included in the rates quoted by the contractor complete all as specified and directed. | 1800.00 | Sqm |
6 Days Left