Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3844267
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Special Repair To Main Road From Dsoi To Gandhi Bagh Under Ge (s) Meerut Cantt
Last Date For Submission23rd May, 2026
Opening Date25 May, 2026
Cost
Document Cost1000.00
EMD219950.00
Estimated Cost14495000.00
Location
CityMeerut
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for repair to Isolated potholes, depth of potholes exceeding 30mm and not exceeding 1.0 Sqm each including sweeping free from dust and mud, or water scoring sunken surfaces in roads, paths, etc cutting edges to at least 25mm in depth, making good by applying tack coat @ 5 Kg per 10 Sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8Kg Per 10 Sqm, blinded with 0.09 Cum of stone chippings, 6.3mm size and again well rammed (including supply of premixed macadm, binder and chippings) complete all as specified and as directed.0.50Ten Sqm
2M&L for premix bituminous macadam mixed with paving bitumen 4% (by weight of total mix) bindre content (VG-30) viscosity grade ant penitration laid / rolled and compacted to required gradient and chamber (consolidated thickness n.exc 75 mm) with 8 to 10 tonne power roller complete all as as specified and directed. Note : (a) 05 Nos of core cutter test to be carried out by contractor on his own cost before laying of SDAC on BM surface at location directed by Engr-in-charge and test report to be submiited before proceesing the RAR/payments (CTL/IIT Roorkee/any Govt Institution as approved by GE). (b) The unit rates are worked out on the basis of binder content of 4% by total mix. Any addition/deduction in the actual binder content used, the rate shall be adjusted as per given in SSR Part-II.0.75Cum
3Preparing surface of road by brushing with wire brushes for removing caked mud etc. cleanning by compressor blower machine and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer(VG-30) viscocity grade @ 5 kg per 10 sq metre complete all as specified and directed.855.00Ten Sqm
4M&L for bituminous premixed semi dense asphaltic 30mm thick (consolidated thickness) stone chippings mixed with 5.5% of binder contents paving bitumen (VG-30) viscosity grade mixed in hot mix plant, transported to site on tippers and LAID WITH MECHANICAL PAVER and rolled to a uniform smooth surface with 8 to 10 tonne power roller and compacted to required camber and gradient complete all as specified and directed. Note : (a) 05 Nos of core cutter test to be carried out by contractor on his own cost before laying of SDAC on BM surface at location directed by Engr-in-charge and test report to be submiited before proceesing the RAR/payments (CTL/IIT Roorkee/any Govt Institution as approved by GE). (b) The unit rates are worked out on the basis of binder content of 4% by total mix. Any addition/deduction in the actual binder content used, the rate shall be adjusted as per given in SSR Part-II.855.00Ten Sqm
5M&L for providing and laying micro surfacing course comprising of dry fine aggregate confirming to Type-II grading of specification, polymer modified cationic slow setting bitumen emulsion (Having 60% binder content 3.60% polymer) ordinary portland cement, chemical additives and water in the following proportion. (fine aggragate conforming to type-II grading @ 9 Kg per sqm of road surface coverage. (ii) Bitumen emulsion @ 13.50%Kg by weight of fine aggrate. (iii) cement @ 1.50% by weight of fine aggrate. (iv) Aadditive @ 1.50% weight of fine aggregate including preparation of bituminous surface with mechanical means and applying a coat of tack coat with hot pressure spray using RS (Rapid setting) bitumen cationic emulsion confirming to IS-8887/ASTMD-297 @ 2.50Kg per sqm over bitumenous Macadam / Black topped surface of existing road complete all as specified and directed. Note:- (1) This item includes all the cost of labours and machineries of bitumen emulsion, ordinary portland cement, chemical additives, agregates and water. (2) This item includes the crack sealing wih bitumen of grade VG-30 sand grout, if any before applying micro surfacing layer. (3) This item includes the cost of making surface levelled with ant mechanical means before appling micro surfacing layer, if the particular portion is having patch work above regular road level.600.00Ten Sqm
23rd May, 2026

39 Days Left

WhatsApp