Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4895705 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repairs Maintenance Of Pump Sets Starters Flocculator Filtration Plant Eqpts Various Type Of Valves And Connected Items Under Ge Mis Mhow |
| Last Date For Submission | 6th Aug, 2026 |
| Opening Date | 08 Aug, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 90000.00 |
| Estimated Cost | 4500000.00 |
| City | MHOW |
|---|---|
| State | Madhya Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | S&F in replacement PVC/ FRP terminal plates suitable for 75/100 HP 3 phase induction motor including provision of GI nut bolt and washers of appropriate size as per existing make and model complete all as specified and as directed. | 4.00 | Each Job |
| 2 | M&L for complete repairing of the flocculator and associated intake and outlet channels, including the following scope of work: (i) Welding and brazing works for replacement of unserviceable wheels. (ii) Replacement (labour only) of wheel bearings with housing covers (04 Nos.) of existing size. (iii) Servicing of 05 Nos. electric motors of the flocculator. (iv) Filling of gear oil (Servo 90, 40 litres). (v) Fixing of carbon brushes (48 Nos.) with shaft, as per existing model/sample. (vi)Fabrication and installation of shaft slip rings, as per approved sample. (vii) Supply and fixing of necessary stainless steel nuts, bolts, and washers. (viii) Testing, commissioning, and ensuring smooth functionality of the complete flocculator system. Complete works shall be carried out in accordance with the technical specifications and as directed by the Engineer-in-Charge. Notes:- 1 All materials required for execution of this item (Bearings, Wheels, Shaft Slip Rings, Carbon Brushes, Gear oil and Copper Windings) shall be measured and paid separately under Item Nos. 2.01 to 2.06. 2. This item covers labour, fabrication, installation, testing, and associated fittings, excluding the supply of materials covered in item No 2.01 to 2.06. 3. After repair, the flocculator must operate smoothly. Any defect arising within 12 months from the date of completion shall be rectified by the contractor at no extra cost to the department. | 1.00 | Each Job |
| 3 | (a) Supply only Bearing | 4.00 | Each |
| 4 | (b) Supply only Wheels | 4.00 | Each |
| 5 | (c) Making of Shaft slip ring as per existing size and model | 1.00 | Each Job |
6 Days Left