Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation And Waterways Department
Tender ID3699594
Organisation NameIrrigation And Waterways Department
Tender BriefCorrigendum : Protection Work Along The Left Bank Of Subarnarekha River By Hdpe Bag Pitching For Length Of 500 M Along With Construction Of Blackstone Boulder Spurs In Mouza Chhatina And Malincha, Block Gopiballavpur Ii, P.s Beliaberah, Dist Jhargram
Last Date For Submission17th Apr, 2026
Opening Date18 Apr, 2026
Cost
Document Cost1000.00
EMD461800.00
Estimated Cost23090004.00
Location
CityMidnapore
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for aking banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.7,371.002Cum
2Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary anddepositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 4.00 km and upto 5.00 km4,130.000Cum
3Extra rate over Item Nos.1 for all kinds of soil for every additional lift of 1.50 metre or part thereof beyond the initial lift of 1.50 metre. 1 No of Lift =2,311.789Cum
42 No of Lift =895.113Cum
53 No of Lift =2,091.647Cum
17th Apr, 2026

10 Days Left

WhatsApp