Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4444100 |
|---|---|
| Organisation Name | West Bengal State Electricity Distribution Company Limited |
| Tender Brief | Construction For Civil Works For Extension Of One No 33kv Feeder Bay And Other Allied Works At Hoomgarh 33/11 Kv Sub.station Under Midnapur Division, Wbsedcl |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 10 Jun, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 6340.00 |
| Estimated Cost | 316952.00 |
| City | Midnapur |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. | 3.00 | Cu.M. |
| 2 | Dismantling R.C floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m including stacking of steel bars. In ground floor. | 3.00 | Cu.M. |
| 3 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer-In-Charge. | 5.00 | Cum. |
| 4 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterie or sandstone) including removing spreading or stacking the spils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches leveling, dressing and ramming the bottom hailing out water as required complete.Depth of excavation not exceeding 1500 mm | 35 | Cu.M. |
| 5 | Earthwork in filling in foundation trenches or plinth with good earth in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. i) With earth obtained from excavation of foundation. (Payment to be made on the basis of measurement of finished quantity of work.) | 15.00 | Cu.M. |
8 Days Left