Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4855787
Organisation NameIrrigation Department
Tender BriefBalance E/w And Pucca Work At Various Chainage In Harpura Minor, Dhorpa Minor, Pakri Minor, Bome Minor And Jorukhad Minor, Off-taking From Parent Canal Rkc.
Last Date For Submission27th Jul, 2026
Opening Date27 Jul, 2026
Cost
Document Cost2360.00
EMD2168000.00
Estimated Cost0.00
Location
CityMirzapur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge.1771.91cum
2Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge.1988.18cum
3Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.2687.94cum
4Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material T&P etc. required for proper completion of work as per direction of Engineer in Charge.1163.51cum
5Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge.2423.44cum
27th Jul, 2026

20 Days Left

WhatsApp