Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4855787 |
|---|---|
| Organisation Name | Irrigation Department |
| Tender Brief | Balance E/w And Pucca Work At Various Chainage In Harpura Minor, Dhorpa Minor, Pakri Minor, Bome Minor And Jorukhad Minor, Off-taking From Parent Canal Rkc. |
| Last Date For Submission | 27th Jul, 2026 |
| Opening Date | 27 Jul, 2026 |
| Document Cost | 2360.00 |
|---|---|
| EMD | 2168000.00 |
| Estimated Cost | 0.00 |
| City | Mirzapur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of canal with manual compaction and dressing below 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1771.91 | cum |
| 2 | Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.60 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge. | 1988.18 | cum |
| 3 | Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. | 2687.94 | cum |
| 4 | Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material T&P etc. required for proper completion of work as per direction of Engineer in Charge. | 1163.51 | cum |
| 5 | Earthwork in filling in canal embankment with mix soil (obtained through excavation of canal) used with total leads upto 210m including cost of all lifts, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge. | 2423.44 | cum |
20 Days Left