Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Irrigation Department
Tender ID4855789
Organisation NameIrrigation Department
Tender BriefBalance Work For Construction Of Pucca Structures And E/w For Construction Of Canal At Various Chainage Between Km. 15.640 To Km. 28.425 Of Left Pandu Basin Canal.
Last Date For Submission27th Jul, 2026
Opening Date27 Jul, 2026
Cost
Document Cost2360.00
EMD2375000.00
Estimated Cost0.00
Location
CityMirzapur
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Ordinary Jungle clearance where growth is continuous for constructing canal including all cost of labour, T&P etc. required for proper completion of work as per direction of Engineer-in-charge.8950.00M2
2Earth work in excavation of canal with manual compaction and dressing of 5.0 to 0.6 cumecs discharge and disposal of surplus earth with manual lead beyond 30M for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material, labour and T&P etc required for proper completion of work as per direction of Engineer-in-charge.25149.65M3
3Excavating soft rock, disintegrated rock or hard shale by pickaxes (not required blasting) including stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer in Charge.22056.73M3
4Excavating other rocks by blasting, removing muck & stacking with extra lead beyond 30m for every lead of 15m or part there of upto total lead of 120m including cost of all lifts, material labour and T&P etc required for proper completion of work as per direction of Engineer-in-Charge.12466.00M3
5Earthwork in filling in canal embankment with borrow area soil used with total lead upto 1.0 km by truck or tractor trolley including cost of all lifts, borrowing earth from private land/approved borrow area land, mechanical compaction to achieve minimum 95% dry density, material labour and T&P etc. for proper completion of work as per direction of Engineer-in-charge.68879.65M3
27th Jul, 2026

20 Days Left

WhatsApp