Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123890 |
|---|---|
| Organisation Name | Rajya Krishi Utpadan Mandi Parishad |
| Tender Brief | Construction Work Of 10 Nos B Category And 10 Nos C Category Shops At The New Mandi Yard Gopiganj |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 27800.00 |
|---|---|
| EMD | 970000.00 |
| Estimated Cost | 15363960.00 |
| City | Mirzapur |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil (loam, clay or sand) including lift up to 1.5M and lead up to 50M. and including filling, watering and ramming of the excavated earth into the trenches or into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 50M. from the foundation trenches.(SI NO 251) | 630.780 | CUM |
| 2 | Providing and laying concrete 1:6:12 (1 cement, 4 fine sand and 8 stone agregate 40 mm size) curing complete, including cost of all T&P complete (S.I. No. 273) | 221.50 | CUM |
| 3 | R.C.C work with cement approved coarse sand and 2 cm. (3/4") gauge approved stone grit in the proportion 1:1.5:3 (1 cement: 2 coarse sand: 4 aggregate) in raft excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWG binding wire and necessary centering and shuttering etc. and also including supply of all materials labour and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150 as per direction of Engineer-in-charge.(S.I,.No.287 A) | 40.86 | CUM |
| 4 | R.C.C work with cement, approved coarse sand and 2cm (3/4") gauge approved stone grit in the proportion of 1:1.5:3 in column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all meterials labour and T&P etc. required for proper completion of the work. . (SI NO 288 A) | 35.18000 | CUM |
| 5 | M-150 brick work in 1:6 cement and coarse sand in super structure avobe plinth level including necessasary cutting and moulding of bricks works as required and also including honey combed brick in thickness of wall more than12cm with all materials labourT&P required for proper completetion of work as per direction of E/I | 384.70000 | CUM |
12 Days Left