Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3990697 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Ward No. 20 Me Saraswati Vidya Mandir Me Hall Ka Nirman Kary Mitti Bharav Va Interlocking Va Farsh Par Kota Stone Ka Kary. |
| Last Date For Submission | 25th Apr, 2026 |
| Opening Date | 25 Apr, 2026 |
| Document Cost | 3894.00 |
|---|---|
| EMD | 323100.00 |
| Estimated Cost | 3231000.00 |
| City | Modinagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 80.00 | sqm |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.2.8.1 All kinds of soil. | 21.75 | cum |
| 3 | Providing and laying in position cement concrete of 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)excluding the cost of centering and shuttering - All work up to plinth level | 2.15 | cum |
| 4 | Brick work with common burnt clay selected F.P.S. (non modular) bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete incement mortar 1:6 (1 cement : 6 coarse sand From ground level upto plinth level | 18.45 | cum |
| 5 | Brick work with common burnt clay selected F.P.S. (non modular) bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10 mm wide 12 mm deep complete incement mortar 1:6 (1 cement : 6 coarse sand Above plinth level upto floor V level | 25.43 | cum |
6 Days Left