| Tender ID | 3988631 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Corrigendum : Ward No. 09 Moh. Kadarabad Me Radha Enclave Bambe Ke Pul Ka Tepar Ka Nirman Kary |
| Last Date For Submission | 20th Apr, 2026 |
| Opening Date | 20 Apr, 2026 |
| Document Cost | 354.00 |
|---|---|
| EMD | 28400.00 |
| Estimated Cost | 284000.00 |
| City | Modinagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Dismantling of the laid interlock tiles including stacking of the tiles as per directed by Engineer Incharge | 151.00 | sqm |
| 2 | Construction of granular sub base by providing well graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achive desire density complete as per technical specification clause as per MORD 401 | 18.50 | cum |
| 3 | M-150 Class B/W in 1:4 cement, coarse sand 1.25 F.M motar in foundation and plinth including supply of all materials, labour , T & P etc. As per P.W.D. S.I. No. 305(a) | 3.40 | cum |
| 4 | Laying of 80 mm thick precast old cement concrete I- shaped interlocking paver blocks with top layer of minimum 8 mm thickness having plan dimension 200x(160+120)mm O.P. cement, smooth high gloss finish, skid resistant; manufactured from rubber moulds through vibro-compression mechanism. The compressive strength of concrete paver block shall not be less than 30MPA (M-30) and weight 5.0 Kg per no . confirming to IS:15658-2006 including all and i/c 4cm sand layer | 91.00 | sqm |
| 5 | Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with grade cementcoarse aggregate not exceeding 25 mm, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. | 17.76 | cum |
4 Days Left