Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123879 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Construction Of An Interlocking Road Complete With Drainage In Village Chandka, Extending From The Shahabad Rampur Road Towards The Devi Sthan (temple). |
| Last Date For Submission | 19th May, 2026 |
| Opening Date | 19 May, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 140000.00 |
| Estimated Cost | 6967000.00 |
| City | Moradabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 | 45.00 | Cum |
| 2 | Granular sub-base/base/surface course by providing well graded material , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with smooth wheeld roller to achieve the desired density, complete as per Technical Specification clause 401. | 47.25 | Cum |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes 53 mm to 22.4 mm to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 236.76 | Cum |
| 4 | Providing and laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawing and Technical Specification Clause 1504. | 2745.00 | Sqm |
| 5 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 130.38 | Cum |
20 Days Left