Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4123892 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of 5x6 M Rcc Box Culvert On Khabari To Rasulpur Bhawar Ehtmali Road (odr) At Km-11 On Damaged Portion In Flood In District Amroha |
| Last Date For Submission | 4th May, 2026 |
| Opening Date | 04 May, 2026 |
| Document Cost | 2354.00 |
|---|---|
| EMD | 1320000.00 |
| Estimated Cost | 22400000.00 |
| City | Moradabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Reference to MORT&H Specification 304 SN.9.01 Rates are including all labour, material, T&P, taxes & labour cess including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 1196.00 | cum |
| 2 | Plain/Reinforced Cement Concrete M15 in Open Foundation complete as per Drawing and Technical Specifications of MORTH. including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 163.00 | cum |
| 3 | RCC Grade M 25 using batching plant transit mixer & manual placing RCC work in Grade M 25 in Open Foundation & Sub Structure with cement approved coarse sand & two cm gauge well graded grit including necessary shuttering placing & binding of reinforcement including its binding with wire but excluding cost of reinforcement & also including supply of all material , labour , T & P etc.required for completion of work. As per Case II MORTH specification 1500, 1700 & 2100. SN.15.11 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 634.00 | cum |
| 4 | Supplying, fitting and placing Mild steel reinforcement complete in sub-structure and Foundation as per drawing and Technical Specification Section As per Reference to MORT&H Specification1600 & 2200 SN. 12.41 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 118.00 | MT |
| 5 | RCC Grade M 25 using batching plant transit mixer & manual placing RCC work in Grade M 25 in Super Structure with cement approved coarse sand & two cm gauge well graded grit including necessary shuttering placing & binding of reinforcement including its binding with wire but excluding cost of reinforcement & also including supply of all material , labour , T & P etc.required for completion of work. As per Reference to Case II MORTH specification 1500, 1700 & 2100. SN. 15.12 including all material, labour, cess, T&P, machinery, and all taxes etc. complete direction by E-I/c but excluding G.S.T. | 435.00 | cum |
5 Days Left