Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Rural Engineering Department
Tender ID4190320
Organisation NameRural Engineering Department
Tender BriefCorrigendum : Community Development Works In Village Mandoura. (member Of Legislative Council)
Last Date For Submission11th Jun, 2026
Opening Date11 Jun, 2026
Cost
Document Cost2354.00
EMD298000.00
Estimated Cost14863000.00
Location
CityMoradabad
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. (DSR Ch-1 sl 2.32 Page No. -95)500.00sqm
2Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drain over areas (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottom, for all lifts, including getting out the excavated soil and dispose of surplus excavated soil as directed within a lead of 50 m. All kinds of soil as per ( DSR Ch-1 S.No.- 2.8.1, Page No. 91 )479.98cum
3Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor: With Chlorpyriphos/Lindane E.C. 20 percent with 1 percent concentration as per DSR 2023 S.I. No. 2.35.3 ,Page No. 95274.94sqm
4Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc.complete for all lift.(Under Floor) ( DSR S.No.- 2.25 (a), Page No. 94 )485.38cum
5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) ( DSR ch-4 S.No.- 4.1.8, Page No. 103 )70.74cum
11th Jun, 2026

6 Days Left

WhatsApp